In Eburru, Energy costs are high and the power is unreliable. These two solar power systems will provide sufficient energy to meet much of CBMs power needs at both the primary school and the high school at zero costs once in place.
Cost = $6,714
Solar Power Project for Lower and Upper School (2 Systems)